Access the Full Project by Clicking here!
Bidjugde
JOB
Domenic Massari Park ADA Walkway
BID DATE
06/12/25 - 11:00
AGENCY
Palmdale
ESTIMATE
n/a
SCOPE
The walkway will be built of concrete and will be approximately 500 feet long (more or less) and 5 feet wide. This involves clearing, grubbing grass on fields as well as on the slopes. Grade and compact to prepare for concrete ADA walkway. As required by ADA guidelines, it will be no more than five percent (5%) slope in the direction of travel on the switchbacks. To meet these ADA requirements, the walkway will have two switchbacks, one on the south side and one on the north side. Since it would be situated between trees and will require boundary edges; care will be taken to ensure that the walkway does not disturb the trees' root systems. Existing trees, grass, and decomposed granite protection must be in place. Work area fencing is mandatory. https://vendors.planetbids.com/portal/23532/bo/bo-detail/129475 jlee@cityofpalmdaleca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT