Access the Full Project by Clicking here!
Bidjugde
JOB
Bob Stump Memorial Peoria (303-A-(233)T) (010-B(224)T)
BID DATE
08/1/25 - 8:00 LIVE!
AGENCY
ADOT
ESTIMATE
$2,953,330
SCOPE
The proposed project 303 MA 112 F0742 01C is located in Maricopa County on SR303L between mileposts 112.0 and 139.0. The work consists of replacing existing High Pressure Sodium (HPS) luminaires with Light Emitting Diode (LED) luminaires. Additional work shall include removing existing light poles at locations shown on the plans. The proposed project 010 MA 120 F0745 01C is located in Maricopa County on Interstate 10 (I10) Papago between Verrado Way at milepost (MP) 120.0 to 99th Avenue at MP 133.5. The work consists of replacing existing High Pressure Sodium (HPS) luminaires with Light Emitting Diode (LED) luminaires. Additional work shall include removing existing light poles at locations shown on the plans.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT