Access the Full Project by Clicking here!
Bidjugde
JOB
CR 1883 Improvements Phase 1
BID DATE
07/7/25 - 12:00
AGENCY
Walton County
ESTIMATE
n/a
SCOPE
All work performed on this project must conform to the standards outlined in the following sections. Milling and Resurfacing: The existing asphalt surface will be milled to a depth as specified in the plans to adequately prepare the subgrade for resurfacing. The resurfacing material shall conform to FDOT Section 320 - Flexible Paving. All milling operations must occur in accordance with FDOT Standard Specifications for Road and Bridge Construction. Drainage Improvements: Minor drainage improvements shall include adjustments to existing structures as per FDOT Standard Specifications, Section 450. All work must conform to drainage standards specified in the project plans and shall maintain proper flow and drainage throughout. Pavement Marking: New pavement markings shall conform to FDOT Standard Specifications, Section 700 and the Manual on Uniform Traffic Control Devices (MUTCD). Materials utilized for pavement marking must comply with FDOT specifications regarding durability and visibility. Roadway Signing: Upgrade and installation of roadway signing must meet the criteria established within FDOT Standard Specifications Section 102 and the MUTCD. Signs shall be reflective and installed at the locations specified in the provided plans to ensure maximum visibility. https://procurement.opengov.com/portal/waltoncountyfl/projects/166878/document?section=1530025
UPDATES