Access the Full Project by Clicking here!
Bidjugde
JOB
Street Paving
BID DATE
06/30/25 - 9:00
AGENCY
Blakely
ESTIMATE
n/a
SCOPE
Work will include surface preparation, asphalt paving, and any associated work needed to complete the project to city and industry standards. Work ¿ Milling and surface preparation ¿ Asphalt paving/leveling to specified thickness and width ¿ Installation of traffic control measures during work ¿ Clean-up and proper disposal of debris ¿ Compliance with all applicable local, state, and federal regulations ¿ COB will Clean up and Remove clippings after paving is complete ¿ Final adjustment of manholes and water valves will be responsibility of COB ¿ Contractor shall mark manholes and water valves manually and with GPS ¿ This contract excludes any permanent pavement markings Specific streets and lengths. https://ssl.doas.state.ga.us/gpr/eventDetails?eSourceNumber=PE-64999-NONST-2025-000000005&sourceSystemType=gpr20 craig.hughes@cityofblakely.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT