Access the Full Project by Clicking here!
Bidjugde
JOB
Pipeline Installation Tamarus St Flamingo Rd Rochelle Ave
BID DATE
06/17/25 - 8:00
AGENCY
Las Vegas VWD
ESTIMATE
$1,544,375
SCOPE
The Work consist of the installation of approximately 1,260 linear feet of 12-inch diameter pipeline as a second source to a single feed street and replace an existing 8-inch ACP section of pipeline in Tamarus Street. The proposed pipeline will wet-tap the existing 24-inch SCCP (C-42) pipeline in Flamingo Road and continue south to Rochelle Avenue where it will connect to the existing 8-inch ACP (X-1498). Additional valves and stub-outs will be provided for future connections (i.e. when existing ACP lines gets replaced on Rochelle Avenue). Service laterals and meter boxes (where Owner deems necessary) will be replaced; the existing meter will remain unless the Owner deems necessary to replace. Purchasing.HelpDesk@lvvwd.com
PREBID
6/3/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT