Access the Full Project by Clicking here!
Bidjugde
JOB
Water Sanitary Sewer Rehabilitation Contract 2022
BID DATE
07/3/25 - 11:00
AGENCY
Fort Worth
ESTIMATE
n/a
SCOPE
Base template for WThe major work will consist of the (approximate) following: 3,246 LF – 24” DIP Water Line by Open Cut 2,687 LF – 12” PVC Water Line by Open Cut 12,772 LF – 8” PVC Water Line by Open Cut 5 EA – 24” Gate Valve w/ Vault 5 EA – 12” Gate Valve 3 EA – 10” Gate Valve 48 EA – 8” Gate Valve 242 EA – Water Service 38,194 SY - 11" Pavement Pulverization 19,090 SY - 2" Surface Milling 1,163 LF – 8” HDPE Pipe Enlargement 4,655 LF – 8” PVC Sewer Pipe by Open Cut 15 EA – 4’ Sewer Manhole 3 EA – 4’ Sewer Drop Manhole 151 EA – 4” Sewer Service https://fortworthtexas.bonfirehub.com/opportunities/187692
UPDATES