Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2014 15 Annual Street Improvement
BID DATE
07/21/15 - 10:00
AGENCY
Hesperia
ESTIMATE
n/a
SCOPE
This project involves the corrective maintenance through reconstruction and preventative maintenance via slurry-seal overlay of selective roads in the City, signal system upgrades, and dirt-road paving. Full depth roadway re-construction will occur on Main Street east of Maple Avenue, as well as some of the worst condition roads. Preventative maintenance in the form of crack seal and slurry will occur on streets that have had corrective maintenance done during the past 5-7 years to extend their usable life. Based on the options selected by the City Council during the Budget process, this preventative maintenance will be performed on approximately 30 miles of roadways throughout the City. In addition, signal upgrade will occur at the Main Street and I Avenue existing signalized intersection. Cynthia Pouvaranukoah (760) 947-1449 cpouvaranukoah@cityofhesperia.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT