Access the Full Project by Clicking here!
Bidjugde
JOB
27 Inch Water Main Repair
BID DATE
09/17/25 - 8:00
AGENCY
El Segundo
ESTIMATE
n/a
SCOPE
Construction activities will include: Utility easement work Excavation and backfill of access pits Shoring and trench plating Installation and removal of water main line stops Dewatering Pre- and post-construction pipe inspection using closed-circuit television (CCTV) Installation of 27-inch-diameter cured-in-place pipe (CIPP) liner Construction of pipe closures Re-energizing the water main Restoring access pit areas to pre-existing condition https://www.elsegundo.org/Home/Components/RFP/RFP/217/268895
UPDATES