Access the Full Project by Clicking here!
Bidjugde
JOB
2024 2025 Pavement Rehabilitation
BID DATE
06/17/25 - 8:00
AGENCY
Arcadia
ESTIMATE
n/a
SCOPE
The work to be done by the Contractor shall be to provide traffic control, 2-inch to 4-inch thick cold mill grind to roadway, apply tack coat, furnish and place 2-inch thick ARHM and HMA asphalt concrete, adjust sewer manhole rings/covers, adjust valve covers, remove and replace misc. PCC concrete sidewalk-curb and gutter-cross gutter/spandrel-driveway approach-ADA curb ramps, installation of ADA truncated dome pads, remove and replace 4-inch thick Asphalt Concrete deep patch, and the replace existing pavement markings. https://www.arcadiaca.gov/bid_detail_T24_R366.php JBalanay@ArcadiaCA.gov
PREBID
6/4/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT