Northeast Water Reclamation Pi Doe Branch Parallel Interceptor Ph I
BID DATE
07/1/25 - 11:00
AGENCY
Upper Trinity Regional Water District
ESTIMATE
$24,850,000
SCOPE
During the current construction phase at Doe Branch WRP (27200?E?University?Dr., Little?Elm, TX?75068), the contractor will install a parallel 54?inch fiberglass gravity interceptor within the UTRWD easement from Station?1+62 to Station?90+30. Most of the alignment will be installed via open?cut trenching across open fields and through emergent wetlands, with a single directional bore beneath US?380 to minimize traffic impacts. Once installed, the new line will be pressure?tested and tied into the existing Junction Box near fishtrap Rd. This work is being performed now to significantly increase conveyance capacity, provide operational redundancy, and ensure long?term reliability for the Doe Branch facility. https://www.civcastusa.com/project/68309b9d80c4ce305156e3fa/summary msouth@walshgroup.com