NE 40th Street Shared Use Path
BID DATE
05/28/25 - 1:00
AGENCY
Redmond
ESTIMATE
$3,400,000
SCOPE
The scope of the project is to construct a shared use path on the south side of NE 40th Street, from the end of existing improvements at 163rd Ave to 172nd Ave. The project will generally remove the existing sidewalk and street tree wells and construct improvements behind the existing curbline. The City may evaluate removing the center turn lane where site constraints are particularly challenging. Typical dimensions include a 5-ft planter/landscape buffer and 12-ft concrete path. Retaining walls are expected to be necessary on portions of the project length. PSE transmission poles are present but the design should attempt to avoid relocation. https://www.redmond.gov/bids.aspx?bidID=296 mross@redmond.gov