JOB
12 Inch Waterline Installation
BID DATE
06/12/25 - 7:00
AGENCY
Varner Creek Utility District
ESTIMATE
n/a
SCOPE
The work generally consists of installation of 260 L.F. 12” C-900 water line and fittings , 17 L.F. 12” ductile iron water line fabrication and installation, installation of 8”x8” tapping sleeve and valve, 12”x8” tee tapping sleeve and valve, 12”x8” tee and 8” gate valve and weld 12” steel flange to 12” steel header, 12” plug valve, 8” globe style silent check valve, construction of 92 S.F. concrete pad with concrete pedestal, blasting and painting piping, installation of an 800 GPM booster pump can; and other items of work as detailed in the plans. https://www.civcastusa.com/project/6810d4c62be10f8178d933e1/summary rliska@bakerlawson.com