Access the Full Project by Clicking here!
Bidjugde
JOB
Street Pavement Rehabilitation Program Cherry Street S East Street S Grand Avenue
BID DATE
06/4/25 - 12:00
AGENCY
Sherman
ESTIMATE
$1,000,000
SCOPE
This project consists of all work associated with the unit price bid for rehabilitation of Cherry Street between S. East Street and S. Grand Avenue, including demolition of the existing street; curb and gutter replacement; demolition and reconstruction of existing drive approaches and sidewalks as necessary to achieve maximum slopes indicated by project details; excavation (3” below bottom of proposed gutter elevation (typ.)) to achieve specified final grade of flex base; placement and compaction of 6”-thick flex base; and, should the Owner decide to award the Additive Alternate, placement of 3”-thick Type D HMAC. Please note that this project is a re-bid, and some work will have already been performed by previous contract, including curb, gutter, and reconstruction of existing drive approaches and sidewalk between S. Vaden Street to the west and Grand Avenue to the east; as well as approximately 700 LF of existing street demolition beginning at S. Grand Avenue and measuring to the west. Asphalt previously placed by City between S. Gribble St. and S. Grand Ave. shall be removed by the City. Project shall include all necessary labor, materials, and testing in accordance with the plans and specifications. https://www.civcastusa.com/project/682ba0b48b092df276ae1d23/summary roberte@cityofsherman.com
PREBID
5/29/2025 12:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT