Access the Full Project by Clicking here!
Bidjugde
JOB
Raw Water Transmission Main Improvements Segments 1 2 3 Phase 1
BID DATE
05/29/25 - 12:00
AGENCY
Travis County Improvement District
ESTIMATE
$3,300,000
SCOPE
Base Bid: • Mobilization, Bonds and Insurance. • 7,223 L.F. of 24” HDPE 4710 DR-11 (200 PSI) Water Main. • 412 L.F. of 14” HDPE 4710 DR-11 (200 PSI) Water Main. • 18 L.F. 12” DI Class 350 Water Main. • 150 L.F. Directional Drill 24” HDPE 4710 DR-11. • 100 L.F. 42” Bore with Steel Encasement. • 2 EA. 24” AWWA Class 350 Gate Valve and Valve Box. • 1 EA. 14” AWWA Class 350 Gate Valve and Valve Box. • 1 EA. 12” AWWA Class 350 Gate Valve and Valve Box. • 3 EA. 3” Water Rated Combination Air Release/Vacuum Valve in Manhole Vault. • 6 EA. Flush/Fire Hydrant Assembly • 7,653 L.F. Chlorination, Pressure Testing and Main Flushing. • 7,653 L.F. Trench Safety and Implementation. • 243 L.F. Granular Trench Backfill at Future Roadway Locations. • SWPPP Book, Erosion Controls, NOI and NOT Submittals. • 6,173 L.F. Installation and Removal of Silt Fence and Mulch Sock. • 100 L.F. Installation and Removal of Rock Check Dam (Rock Berm) in Seven (7) locations. • 4 Each Installation and Removal of Construction Exit and Entrance. • 1 Each Installation and Removal of Concrete Washout. • 6.05 AC. Clear and Grub all areas within the Limits of Water Main Route. • 29,298 SY Revegetation and Stabilization of all areas within the limits of Disturbance. • 29,298 SY Temporary Watering for Revegetated areas until 80% coverage is achieved. • Construction Staking. • Traffic Control and Implementation. https://www.civcastusa.com/project/68235f3cbd42b4b3bccf0b61/summary iramirez@langan.com
PREBID
5/20/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT