Access the Full Project by Clicking here!
Bidjugde
JOB
CDBG Central Park Trail
BID DATE
06/10/25 - 11:00
AGENCY
Ormond Beach
ESTIMATE
n/a
SCOPE
The proposed 8’ foot wide concrete trail (270’ lineal feet) will be on the north side of the existing retention pond and connect to the existing sidewalk near the Discovery Center. From the east end of the concrete trail an 8’ foot wide wood boardwalk system (820 lineal feet) will snake through the woods and will connect to Division Avenue. This boardwalk will line up with the existing stripped crosswalk and existing southern boardwalk trail, see drawing sheet 2 of 4. A new concrete ADA curb transition will be installed per the plans. This project will be in strict accordance with the American Disabilities Act (ADA) requirements, and per the approved plans, specifications and Invitation to Bid. All work done on the sidewalk improvements project must adhere to the Heavy Wage Determination, FL 20250137, see CDBG Requirements in the project manual. https://www.demandstar.com/app/limited/bids/496737/details
PREBID
5/22/2025 11:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT