Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Federal Overlay Broadway California Street 18th Street
BID DATE
06/3/25 - 11:00
AGENCY
Everett
ESTIMATE
$1,269,464
SCOPE
The project includes, is not limited to, the construction of up to 4,849 tons of Hot Mix Asphalt, Class ½-inch, PG 64-22, two inches (2”) thick, on selected City streets, including grinding, utility adjustments, such as manhole, catch basin, inlet, valve box, monument case and cover, striping, channelization, traffic induction loops, and performing all other work as required by the contract. http://bxwa.com/bxwa_toc/pub/263/ev55_2025_federal_overlay_broa_46743/info.php gloring@everettwa.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT