Access the Full Project by Clicking here!
Bidjugde
JOB
Beach Drive NE Water Main Creek Crossing
BID DATE
06/3/25 - 7:00
AGENCY
Shoreline
ESTIMATE
$1,250,000
SCOPE
The project includes installation of approximately 600 lineal feet of 8-inch, 6-inch and 4- inch Ductile Iron (DI), water main, 535 lineal feet of 10-inch HDPE water main installed via horizontal direction drilling (HDD) under McAleer Creek, connections to the existing system, valves, reestablishing existing services, trenching and backfilling operations, appurtenances, storm sewer system replacements, HMA patching, planing and overlay and associated work. This work is within the City of Lake Forest Park existing Right of Way in Beach Dr NE between 45th Ave NE and the Burke Gilman Trail. http://bxwa.com/bxwa_toc/pub/2549/ncw10_beach_drive_ne_water_mai_54266/info.php maxw@northcitywater.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT