Access the Full Project by Clicking here!
Bidjugde
JOB
Rotomillings Surfacing Summer 2025
BID DATE
06/3/25 - 1:00
AGENCY
Summit County
ESTIMATE
n/a
SCOPE
Rotomill tailings will be placed on the roadways as directed by the engineer from a di!erent project shown on the project map (next page). If miillings are not placed on the roadways, obtain the millings that will be stockpiled at a few potential locations shown on the project map. Spread millings uniformly in 3 inch lifts on the routes shown in the project map. Prepare, spread and compact millings such that final surface is graded for adequate surface water runo!. Compact the entire surface of each lift of millings with at least 4 to 6 passes of a vibratory roller as verified by the engineer. https://utah.bonfirehub.com/opportunities/186753 aclerk@summitcosa3ut.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT