Access the Full Project by Clicking here!
Bidjugde
JOB
24 024 Cherapple 1000 N Flooding
BID DATE
05/29/25 - 10:00
AGENCY
Orem
ESTIMATE
n/a
SCOPE
The WORK will consist of installation of storm drain infrastructure in the Cherapple neighborhood and 1000 N including: storm drain manholes, pretreatment catch basins with snouts, deep sumps, regular sumps, concrete storm drain line, removal of existing sump, removal and replacement of monolithic curb, gutter and sidewalk. Also included are improvements to the frontage of the Heather Road LDS chapel including: reworking of drive approaches and sidewalk, curb wall behind sidewalk, landscape restoration, and removal and replacement of curb and gutter. https://orem.gov/bid-advertisement-24-024-cherapple-1000-n-flooding-project/
PREBID
5/15/2025 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT