Access the Full Project by Clicking here!
Bidjugde
JOB
Las Drainage Improvements Taxiway D
BID DATE
06/18/25 - 1:00
AGENCY
Clark County Department Aviation
ESTIMATE
n/a
SCOPE
This project is located at Harry Reid International Airport in the airfield immediately east of Taxiway "D." The work entails installation of 2,500 linear feet of reinforced concrete box (RCB) storm drain with associated manhole and drop inlet structures. This storm drain system will connect to future facilities in Gus Giuffre Drive. Miscellaneous underground utility work will be required to install the RCB storm drain including but not limited to an 18-inch diameter asbestos cement pipe (ACP) airport water main re-routing and lowering, and airport sanitary sewer pipeline re-routing in Kitty Hawk Way. The work also entails re-construction of airport Gate 37 with a new manual crash rated gate. An existing airport detention basin located east of Taxiway "D" will be filled in and abandoned as part of the work. Various roadway curb and gutter improvements are also proposed at the intersection with Rental Car Road and Gus Giuffre Drive as an alternate. contracts@lasairport.com
UPDATES