Access the Full Project by Clicking here!
Bidjugde
JOB
2025 ADA Sidewalks Improvement
BID DATE
06/13/25 - 11:30
AGENCY
Pensacola
ESTIMATE
n/a
SCOPE
The goal of this project is the installation of new sidewalk and replacement of dilapidated sidewalks identified as needing repairs. These sidewalks serve neighborhoods with poor walkability. The 2025 Sidewalk project also includes the improvement of several driveway sections that intersect the sidewalks within the ROW. Those improvements shall be constructed to the provided standard driveway detail. The standard sidewalk is 4” thick but shall be 6” thick where the sidewalk crosses a driveway apron. On streets lined with concrete curbs, a curb cut will be required for the driveway improvements. On streets without curbs, the specified driveway dimensions still apply, but driveways do not require “tie-ins” or construction of new curb. This project also calls for the placement of thermoplastic pavement striping for crosswalks and for the installation of detectable warning plates for pedestrians. Thermoplastic shall be placed beginning at the edge of asphalt. https://www.cityofpensacola.com/bids.aspx?bidID=563
UPDATES