Access the Full Project by Clicking here!
Bidjugde
JOB
Design Build N1C Upgrade A MLS Reroute Tidevue FM Flows N1C Gravity Main
BID DATE
05/30/25 - 10:00
AGENCY
Manatee County
ESTIMATE
n/a
SCOPE
This project is designed to correct the wet weather high-flow hydraulic overloading on the Tidevue force main by lowering the head pressure condition in the Tidevue force main. To convert Lift Station (LS) N1C to a Master Lift Station (MLS), including furnishing and installation of a new polymer concrete wet well, four (4) 92-hp pumps with Variable Frequency Drives (VFDs), a new building for/with electrical upgrades, odor control, and slab, new piping, valving, and appurtenances, a 400kW portable generator docking station, docking station and slab, site demolition/preparation/restoration, flow meter, vaults, crane, and force main and manhole improvements (First three (3) upstream manholes will be polymer concrete). Upgrade LS N1C discharge force main to 20 inches. Disconnect the Tidevue force main from the LS N1C discharge side and connected to the N1C gravity influent manhole. Install small restroom in electrical controls room along with lighting and sewer/water connections. Install shower and eye wash station outside restroom. Conduct Arc Flash study.. https://public.mymanatee.org/rfp_post/controller?rfp_id=25-R086798RB&action=details&view=home purchasing@mymanatee.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT