Access the Full Project by Clicking here!
Bidjugde
JOB
Airpark Asphalt Taxiway
BID DATE
06/11/25 - 11:00
AGENCY
Clearwater
ESTIMATE
$2,000,000
SCOPE
Installation of Stormwater dry retention ponds, underdrain piping, impervious pvc pond liners, 15”-36” Reinforced concrete pipe, FDOT stormwater inlets and structures, and milling and overlay of existing taxiway and roadways to facilitate installation of drainage elements. Remove existing Taxiway “A” Markings, application of a rejuvenating sealcoat, and Re-Marking of effected Taxiway A and Connector areas. Two Inch Bituminous asphalt milling and overlay of Polymer modified PG76-22 Asphalt Surface Course within the along the main t-hanger taxilane area. Two Inch Bituminous asphalt milling and overlay of Polymer modified PG76-22 Asphalt Surface Course within the identified T-Hangar areas (Buildings G-H). 2 ¼ Inch Bituminous asphalt milling and overlay of Polymer modified PG76-22 Asphalt Surface Course within the Hangar Apron Area identified. Removal of existing Center Taxiway and reconstruction with new re-aligned taxiway compliant with FAA and FDOT regulations. This includes excavation for the installation of new FDOT base course material, and new 2” asphalt surface course consisting of PG76-22 Polymer modified binder. Additionally the area will include aircraft tie down anchors and re-marking of the Taxiway Centerlines and Parking positions. Minor electrical modifications are required to relocate existing circuitry crossings. https://procurement.opengov.com/portal/myclearwater/projects/164303
PREBID
5/21/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT