Access the Full Project by Clicking here!
Bidjugde
JOB
TP Cycle 4 Murrieta Creek Multi Use Trail
BID DATE
06/17/25 - 11:00
AGENCY
Lake Elsinore
ESTIMATE
n/a
SCOPE
In general, this project will consist of construction of 1.3-mile multi-use trail at in the back basin area of the City of Lake Elsinore. The work involves construction of hot mix asphalt pavement, grading, retaining walls (Caltrans STD B3-7A), concrete brow ditch, PCC pavement, storm drain RCP and headwall, prefabricated pedestrian bridge, abutment and foundation, wood post fence and chain-link fence, wayfinding signage and headwall, temporary water pollution control, signing and marking, and any other work as may be required. https://vendors.planetbids.com/portal/14272/bo/bo-detail/129811 nmccalmont@lake-elsinore.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT