Access the Full Project by Clicking here!
Bidjugde
JOB
EJ Miller Park Sidewalk Replacement
BID DATE
05/22/25 - 8:00
AGENCY
MRSC Rosters
ESTIMATE
$31,305
SCOPE
The scope of work shall include the following: • Remove the existing 4 foot wide cement concrete sidewalk, City personnel will mark the limits of sidewalk to be removed, the estimated length is 216 lineal feet • Load the concrete into City owned dump trucks, City personnel will dispose of the concrete materials • Excavate and widened the subgrade to accommodate new 5 foot wide sidewalk, 4 inch thick. Excavated depth shall be approximately 2 inches below existing subgrade. Excavated material shall be saved for landscape restoration on both sides of the sidewalk • Grade and compact subgrade, a City Inspector will verify subgrade compaction • Haul, place, grade and compact 2 inches of crushed surfacing top course, a City Inspector will verify the top course compaction • Form and pour cement concrete sidewalk 5 foot wide, 4 inch thick, cement concrete shall be 6 sack mix, 564 lbs of cement per cubic yard • Landscape restoration on both sides of sidewalk – Contractor shall place the excavated material from subgrade work along the sides of the completed sidewalk. https://mrscrosters.bonfirehub.com/opportunities/185580

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT