Annual Storm Drain Rehabilitation Repair FY 2015 2016
BID DATE
08/6/15 - 10:00
AGENCY
Encinitas
ESTIMATE
n/a
SCOPE
Work to be done consists of the rehabilitation and repair of existing CMP storm drains within the City of Encinitas that are badly corroded. Work includes point repairs, concrete invert/void paving, Cured in Place Pipe Liners (CIPP), HDPE Solid Wall Pipe Liners, replacement of existing catch basins with prefabricated catch basins, and other miscellaneous items of work as called out in the project specifications. The cost of construction is estimated to be $550,000, (Summation of Base Bid and the Three Additive Alternate Bids). Work to be completed within 60 working days. Kipp Hefner at (760)633-2775 or khefner@encinitasca.gov.