Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Spring Patching Street Overlay
BID DATE
05/15/25 - 10:30
AGENCY
Atherton
ESTIMATE
n/a
SCOPE
Grinding and replacing approximately 27,625 square feet of asphalt to a six-inch depth on various streets. This work includes all necessary traffic control, grinding, sweeping, tack coating, replacing asphalt to appropriate depth in an appropriate number of lifts, and finishing rolling per Town of Atherton Standard specifications and special provisions. Some hand work around utility manhole covers will be required. Grinding and replacing of approximately 70,000 square feet of asphalt for 2 inches of asphalt concrete pavement on Various Streets. Once the roadway is grinded down, the contractor and the Town’s project engineer shall identify any pavement failures for repairs. Grind and replace (digouts) asphalt to a 6-inch depth from the milled surface: then contractor shall perform crack sealing (per specification). Some hand work around utility manhole covers will be necessary. Repave the entire street with a self-propelled paver & finish per Town Standard Specifications. Reconstruct manhole to grade at Southgate Drive/Park Drive, including root removal and pavement repairs. Replacement and installation of traffic striping, pavement markings, and markers. https://www.ci.atherton.ca.us/bids.aspx?bidID=106

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT