Access the Full Project by Clicking here!
Bidjugde
JOB
Orange Avenue 20 Inch Water Line Replacement From Fannin Street Forsythe Street
BID DATE
06/5/25 - 11:00
AGENCY
City of Beaumont Water Utilities
ESTIMATE
n/a
SCOPE
REPLACEMENT OF 20” WATER LINE FOR ORANGE AVENUE, FROM FANNIN STREET TO FORSYTHE STREET: a. Provide for the abandonment and replacement of approximately 443 LF of existing 20” water line with new 20” polyvinyl chloride (PVC) water line, approximately 437 LF of 32” schedule 40 steel casing, approximately 3 connections to existing water lines, relocation of existing fire hydrant, gate valves, combination air release valves, fittings, boring, boring under railroads, and various other improvements necessary for a complete installation. b. This contract shall include all necessary superintendence, labor, materials, equipment, tools, piping, field jointing, cleaning, grouting, excavation, trenching, shoring, fill, grading, backfill, surface restoration, testing, hauling and disposal of excess soils, and incidental items necessary for the construction of the proposed facilities as shown in the plans and documented in the specifications. c. The Contractor is responsible for the restoration of all disturbed surfaces, including pavement. All surfaces shall be returned to their original condition or better. This includes streets, road surfaces, driveways, and ditches. https://www.civcastusa.com/project/6813688e972d8d9a925d77a9/summary edward.brown@beaumonttexas.gov
UPDATES