Access the Full Project by Clicking here!
Bidjugde
JOB
Watauga Water Wastewater Cip Group 2
BID DATE
05/21/25 - 8:00
AGENCY
Watauga
ESTIMATE
$4,300,000
SCOPE
Construction of Water and Wastewater CIP, Group 2 in the City of Watauga, Texas, together with the necessary appertaining work, more or less as listed below: 1,615 LF 12" Dia. (SDR-26) PVC Sewer Line 660 LF 10" Dia. (SDR-26) PVC Sewer Line 4,175 LF 8" Dia. (SDR-26) PVC Sewer Line 54 LF 6" Dia. (SDR-26) PVC Sewer Line 5 EA 5' Dia. Sanitary Sewer Manhole 15 EA 4' Dia. Sanitary Sewer Manhole 3 EA 5' Dia. Sanitary Sewer Drop Manhole 2,549 LF 4" Dia. (SCH. 40) Sanitary Sewer Service Line 7,807 LF Temporary Pavement Replacement for Sewer Lines 16 EA Connect to Existing 6"/8" SS Line 38 EA Cut and Plug Existing 6"/8"/12" SS Line 5 LS Bypass Pumping 5 Areas 1,093 LF 8" Dia. (DR-18) Water Line 5 EA 8" Gate Valve 0.9 TONS Ductile Iron Fittings for Water Line 4 EA Connect to Existing 6"/8" Water Line 7 EA Long Double Water Service 7 EA Short Double Water Service 21,615 SY 2" Thk. Type "D" HMAC Compacted 19,514 SY 5" Thk. Type "B" HMAC Compacted 2,101 SY 7" Thk. Type "B" HMAC Compacted 19,514 SY 6" Thk. Lime Stabilized Subgrade 2,101 SY 10" Thk. Lime Stabilized Subgrade 439 TONS Lime for Subgrade Stabilization https://www.civcastusa.com/project/68112f21a12bd610f988283c/summary lyndon.crouch@burgessniple.com
PREBID
5/14/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT