Access the Full Project by Clicking here!
Bidjugde
JOB
Pelanconi Drainage Weir Replacement
BID DATE
07/23/15 - 2:00
AGENCY
Anaheim
ESTIMATE
$205,595
SCOPE
The work consists of the furnishing of all necessary: Labor; Materials; Equipment; Permits; Performance, Material and Labor Payment Bonds; and Insurance required to perform the Work of constructing the Project as outlined in the Contract Documents. The general items of work include installation of gabion wall devices to replace existing deteriorated wood pile structures at 7 specified locations and removal of displaced and/or unnecessary old rip rap rock structures. Paralleling this work will be removal of trees and vegetation as well as habitat restoration.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT