Access the Full Project by Clicking here!
Bidjugde
JOB
Civic Center Wastewater Treatment Facility - Phase I
BID DATE
08/27/15 - 3:30
AGENCY
Malibu
ESTIMATE
n/a
SCOPE
In general, the proposed improvements consist of a wastewater treatment facility, injection wells, recycled water distribution system and a sanitation collection system. The work includes an influent pump station, equalization basin, headworks with flow meter, screen and grit removal, intermediate pump stations, bioreactors, aeration blowers, membrane reactors, blowers and pumps, citric acid feed system, UV disinfection, recycled water pump stations and tanks, sodium hypochlorite and magnesium hydroxide systems, solids storage tank, membrane thickening transfer pump, membrane solids thickening system, odor control system, Headworks building, Membrane Tank enclosure with roof, Blower and Electrical building, Solids building, Operations and Laboratory building, HVAC, electrical, instrumentation/controls, mechanical, demolition, sitework improvements and landscaping and irrigation. The work also includes HDPE pipelines, HDPE manholes, concrete manholes, air release valves, recycled water service laterals, lift stations, trenching, trenchless pipe installation, Best Management Practices (BMP), mitigation, monitoring and reporting requirements, traffic control, dewatering, pavement resurfacing and all other appurtenant work included and shown in the Contract Documents and Specifications. The Contractor shall also take over operations and maintenance of the existing wastewater treatment facility service Colony Plaza shopping center for the duration of project construction and startup of the new treatment plant facility. Rob DuBoux, 310-456-2489 ext. 339 rduboux@malibucity.org
PREBID
7/28/2015 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT