Access the Full Project by Clicking here!
Bidjugde
JOB
Fulton Mall Reconstruction
BID DATE
10/20/15 - 3:00
AGENCY
Fresno
ESTIMATE
$2,147,483,647
SCOPE
BID PACKAGE FMR 01The Fulton Mall Reconstruction Project involves complete reconstruction of the Fulton Mall corridor. The existing pedestrian mall will be completely removed. New streets will be constructed on Fulton from Tuolumne to Inyo Streets. The side streets of Merced, Mariposa, and Kern will similarly be opened to vehicles, with the exceptions that Kern between Fulton and Chuckchansi Park and Mariposa between Federal Alley and Van Ness remain pedestrian plazas. Street reconstruction includes new straight, two-way streets with one travel lane in each direction, parallel parking, and wide sidewalks. Perpendicular parking is introduced to one side of Mariposa between Fulton and Federal Alley. In some locations along the street, parking will not be provided in order to preserve existing, healthy, shade trees. Wide sidewalks, bulb outs, and mid-block pedestrian crossings, identified with special paving, contribute to a pedestrian-friendly environment. The design provides a standard 14’ sidewalk on one side and a substantially wider 28’ sidewalk promenade zone on the other to retain qualities of the original Garrett Eckbo design. The expanded sidewalk promenade zone provides ample area for the reconstruction of fountains, relocation of artwork, and planting new shade trees. The project includes new power infrastructure, street lighting, site furnishings, signage and intersection improvements including new traffic signals at the Fulton Street intersections with Tuolumne, Fresno, Tulare and Inyo Streets. BID PACKAGE FMR 02The Reconstruction of Sewer and Water Mains in Merced, Tuolumne, and Tulare Streets package includes the reconstruction of approximately 386 lineal feet of 12-inch water main in Tuolumne Street, 380 lineal feet of 12-inch water main in Tulare Street, 379 lineal feet of 8-inch water main in Merced Street, fire hydrants, and related appurtenances. The package also includes approximately 1,239 lineal feet of 30-inch sewer main in Merced Street, along with related manholes and connections to existing sewers.
PREBID
8/5/2015 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT