Access the Full Project by Clicking here!
Bidjugde
JOB
Village Parkway Extension North
BID DATE
08/4/15 - 2:00
AGENCY
West Sacramento
ESTIMATE
$5,190,270
SCOPE
The proposed work consists of the following: The project will extend Village Parkway from the current terminus at Stonegate Drive to the Mike McGowan Bridge over the Yolo Barge Canal within the City of West Sacramento. The new roadway will accommodate two 12-foot-wide lanes in each direction (initially striped for one), a 16 foot wide raised median, 8 foot wide bicycle lanes, 5 foot wide sidewalks set back from the curb by 5 foot wide landscaping strips, street lights, and underground utility infrastructure. The proposed roadway will connect to existing area roadways with two roundabout intersections. A roundabout at the southern end of the project would replace the existing intersection between Village Parkway and Stonegate Road. Locks Drive would initially connect to the proposed roadway with a stop sign controlled intersection at the northern end of the proposed roadway but would ultimately utilize a second roundabout intersection approximately 0.1 miles south of the bridge.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT