Access the Full Project by Clicking here!
Bidjugde
JOB
Phase 15 Waterline Replacement
BID DATE
05/20/25 - 11:00 LIVE!
AGENCY
Edmonds
ESTIMATE
n/a
SCOPE
The City of Edmonds Phase 15 Waterline project covered by these specifications and bid documents involves two schedules (A and B). The project consists of ±680 LF of 4-inch restrained joint ductile iron pipe with associated fittings and other appurtenances; ±70 LF of 6-inch restrained joint ductile iron pipe with associated fittings and other appurtenances; ±4,730 LF of 8-inch restrained joint ductile iron pipe with associated fittings and other appurtenances; 9 fire hydrants; 12 connections to existing water main; water service replacements; temporary main and services; temporary traffic control, temporary and permanent road restoration, and property restoration. russell.lynch@edmondswa.gov LIVE: Join a live stream of the bid opening at the following website https://edmondswa-gov.zoom.us/j/84080746315?pwd=eQlEcmPZS4YyMjOfABweP55i_UyevA.NdzgugxKjp5bQcL Meeting ID: 840 8074 6315 Passcode: 661617

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT