NDOW Raw Water Pipeline Installation
BID DATE
06/3/25 - 8:00
AGENCY
Las Vegas VWD
ESTIMATE
$8,402,400
SCOPE
The Work consists of the installation of approximately 7,310 linear feet of 12-inch diameter raw water pipe. The raw water pipeline shall include isolation valves, air valves, blow-offs, meter assembly, and related waterline appurtenances. The project shall connect to the existing raw water pipeline within the Owner’s Bifurcation Vault and continue in a northerly direction before terminating and connecting to the Nevada Department of Wildlife Lake Mead Fish Hatchery’s existing pipeline infrastructure. Purchasing.HelpDesk@lvvwd.com
PREBID
5/8/2025 8:00