Access the Full Project by Clicking here!
Bidjugde
JOB
SU010 Childs Ave 12th 11th St Storm
BID DATE
05/6/25 - 10:00
AGENCY
Ogden
ESTIMATE
$370,000
SCOPE
Install approximately 645 ft of 15" RCP Storm Main, three 60" manholes, four catch basins, and connect pipe to the existing catch basin on 12th Street. Remove and replace some curb and gutter, flatwork, and ADA ramp.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT