Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Drain Catch Basin Connector Pipe Screens
BID DATE
08/10/15 - 2:30
AGENCY
Santa Monica
ESTIMATE
$480,000
SCOPE
As part of the effort to achieve compliance with the Santa Monica Bay Nearshore and Offshore Debris Total Maximum Daily Load objectives, a full capture connector pipe screen (CPS) system will be retrofitted in all catch basins within the Kenter Canyon watershed. Locations in high trash areas will be retrofitted with Automatic Retractable Screens (ARS) in addition to the CPS units. The City has identified 745 catch basin locations to be evaluated for retrofit. Joshua Carvalho joshua.carvalho@smgov.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT