Access the Full Project by Clicking here!
Bidjugde
JOB
Recycled Water Distribution Santa Maria County Club
BID DATE
06/5/25 - 11:00
AGENCY
Santa Barbara County
ESTIMATE
$1,501,200
SCOPE
The Project consists of the extension of 0.35 mile of 10-inch, and 0.76 mile of 8-inch recycled water distribution pipeline from Waller Park’s recycled water tank pump station to the Santa Maria Country Club water ponds, valves at pond outlet locations, and miscellaneous irrigation system signing, marking and labeling. The project installs the pipeline mainly via horizontal directional drilling, and involves a segment of jack and bore underneath an existing railroad. The Project also includes all ancillary stormwater control measures and other work detailed in the Project Drawings and Specifications. https://vendors.planetbids.com/portal/43874/bo/bo-detail/129252 kethomp@countyofsb.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT