JOB
Lower Lateral Replacement
BID DATE
05/21/25 - 12:00
AGENCY
Redwood City
ESTIMATE
n/a
SCOPE
Full lower lateral replacement consisting of approximately 28 linear pipe feet of 4-inch diameter sewer pipe and subsequent site restoration. Lateral replacement will occur from the driveway apron to the sewer main connection in the street, including replacement of the saddle. Approximate depth at the driveway cleanout is 6 feet and 20 feet depth to top of main in the street. The lateral ties into a 12-inch diameter VCP gravity sewer main. https://www.redwoodcity.org/Home/Components/RFP/RFP/1982/2322
PREBID
5/2/2025 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT