Access the Full Project by Clicking here!
Bidjugde
JOB
Wastewater Treatment Plant Mashel River Bank Stabilization
BID DATE
05/13/25 - 11:00
AGENCY
Wylie
ESTIMATE
$846,785
SCOPE
The Wastewater Treatment Plant Mashel River Bank Stabilization provides for the protection of approximately 300 feet of streambank along the right (northerly) bank of the Mashel River. The work includes, but is not limited to, site clearing; furnishing and installing engineered wood structures consisting of toe logs, ballasted log rows, and ballasted engineered log jam (ELJ) structures above and below water; embankment reshaping including furnishing and installing gravel and cobble above and below water; temporary erosion and sediment control; signage; site restoration; planting; fence replacement and other work. All work shall be done in accordance with the attached Contract Plans, these Contract Provisions, and the Standard Specifications. http://bxwa.com/bxwa_toc/pub/1462/eat14_wastewater_treatment_pla_32921/info.php rraymond@parametrix.com
PREBID
5/1/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT