Access the Full Project by Clicking here!
Bidjugde
JOB
2021 Cmom Package 5
BID DATE
05/9/25 - 7:00
AGENCY
San Antonio Water System
ESTIMATE
$9,000,000
SCOPE
Sealed bids are requested by the San Antonio Water System for the installation of approximately 4,982 linear feet of 8” to 10” sanitary sewer main and approximately 216 linear feet of 8” and 10” carrier pipe within 24” and 30” steel casing via open cut, the replacement of 5,492 linear feet of 8” to 10” sanitary sewer main via pipe bursting, the installation of 135 linear feet of 24” steel casing with 8” carrier pipe via jack and bore, and associated manhole improvements including the installation of two siphon structures as well as bypass pumping and traffic control throughout the City of San Antonio for the 2021 CMOM Package 5 Project, https://www.civcastusa.com/project/67ffc1d95c5ef658de159ccb/summary contracting@saws.org
PREBID
4/21/2025 7:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT