Access the Full Project by Clicking here!
Bidjugde
JOB
2025 Morgan Hill Water Main Replacement
BID DATE
05/6/25 - 11:00
AGENCY
Morgan Hill
ESTIMATE
n/a
SCOPE
Abandonment of existing water main at Main Avenue/Hale Avenue Shopping Center and Install new 8” water main with water services to existing water meter boxes, new valves, and hydrants, back fill, trench restoration, slurry seal, and striping. Installation of an 8” water main between White Oak Court and Hilltop Court, backfill, trench restoration with valve installation, abandon existing valves and reconnection to existing water system. https://www.morganhill.ca.gov/bids.aspx?bidID=467 yat.cho@morganhill.ca.gov "
UPDATES