Access the Full Project by Clicking here!
Bidjugde
JOB
Itb Green Tee Transite Pipe Waterline Replacement
BID DATE
05/16/25 - 11:00
AGENCY
Pearland
ESTIMATE
n/a
SCOPE
The project will entail the replacement of approximately 6 miles of 8 and 6-inch diameter water distribution lines with all necessary valves and appurtenances. The work includes replacement of fire hydrants across the entire project scope. In addition, three new fire hydrants will be installed at the following cul-de-sacs: Kerry Cir, Dublin Cir, and Caloway Cir, and a few hydrants will be installed other locations to maintain compliance with City of Pearland design standards. Several fire hydrants will be relocated in order to conform to maximum distance requirements as well. Additionally, a pressure sensor and a sampling station will be installed at separate locations along Eagles Way. https://www.civcastusa.com/project/67f974d4ae054c6efe660b7d/summary mlangley@pearlandtx.gov
PREBID
4/24/2025 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT