Runway 10 28 Rehabilitation Correction Expansive Pavement Runway 10 End
BID DATE
05/21/25 - 11:00
AGENCY
Pompano Beach
ESTIMATE
n/a
SCOPE
• Runway 10-28 o Rehabilitate the full length and width of the runway pavement ? Excludes the new 185-ft eastern extension constructed under a separate project o Replace the runway lighting to an LED fixtures system o Minor grading of the runway shoulders and safety area where existing grades exceed minimum or maximum thresholds. • Taxiway A o Correct wide expanse of pavement north of Taxiway K https://pompanobeachfl.ionwave.net/PublicDetail.aspx?bidID=951&SourceType=1 eric.seifer@copbfl.com