Access the Full Project by Clicking here!
Bidjugde
JOB
CDBG Military Boulevard Sidewalk Improvements
BID DATE
05/22/25 - 11:00
AGENCY
Ormond Beach
ESTIMATE
n/a
SCOPE
The work consists of removing an existing 2’-6” foot non-ADA deteriorated concrete sidewalk and replacing it with a new 5’ foot ADA compliant concrete sidewalk, including ADA compliant detectable mats and curbing on the west & east sides of Military Boulevard, from Woodlands Boulevard to Vanderbilt Drive. Certain sections of Military Boulevard do not have continuous sidewalks, and these areas will be added to provide a continuous sidewalk connection where applicable. This project will be in strict accordance with the American Disabilities Act (ADA) requirements, and per the approved plans, specifications and Invitation to Bid. All work done on the sidewalk improvements project must adhere to the Highway Wage Determination, FL 20250274, see CDBG Requirements in the project manual. The work is shown on the Drawings and specified in the Project Manual. https://www.demandstar.com/app/limited/bids/495739/details

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT