Access the Full Project by Clicking here!
Bidjugde
JOB
CDBG Division Avenue North Side Sidewalk Improvements
BID DATE
05/28/25 - 11:00
AGENCY
Ormond Beach
ESTIMATE
n/a
SCOPE
The work consists of removing an existing 4’ foot non-ADA deteriorated concrete sidewalk and replacing it with a new 5’ foot ADA compliant concrete sidewalk, including ADA compliant detectable mats and curbing in strict accordance with the American Disabilities Act (ADA) requirements on the north side of Division Avenue from Bostrom Lane to South Ridgewood Avenue per the approved plans, specifications and Invitation to Bid. A bid alternate #1 section from east side of South Washington Street sidewalk to Roosevelt Drive and bid alternate #2 section from Roosevelt Drive to South Ridgewood Avenue, will be included if sufficient funding is available. All work done on the sidewalk improvements project must adhere to the Highway Wage Determination, FL 20230191, see CDBG Requirements in the project manual. The work is shown on the Drawings and specified in the Project Manual. https://www.demandstar.com/app/limited/bids/495737/details
PREBID
5/15/2025 11:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT