Access the Full Project by Clicking here!
Bidjugde
JOB
Arrowhead Ln Water Main Replacement
BID DATE
05/14/25 - 12:00
AGENCY
Murray
ESTIMATE
n/a
SCOPE
This project includes approximately 4,000 LF of new 8-inch ductile iron pipe. connection to existing 10-inch CIP in 900 E, 2 connections to the existing 6-inch ductile iron pipe, removal and salvaging of existing hydrants, new hydrants, reconnection of existing service laterals via copper flare connector, installation of a combination air valve and vault, with water service planned to stay active for construction, with a coordinated switch over. Includes incidental restoration of disturbed waterway, and landscaping, Includes asphalt removal, disposal and placement. Also includes 4 cast-in-place sewer manholes with concrete collars. https://utah.bonfirehub.com/opportunities/183211 afrisk@murray.utah.gov
PREBID
4/28/2025 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT