SCOPE
The City anticipates the scope of work for the Project to consist of the following responsibilities and the following items: • Project funded through Economic Development Administration (EDA) Grant • Remove existing two lane, open ditch, asphalt roadway and replace with three lane, concrete/curbed roadway with storm sewer system. • Remove and replace existing bridge with TxDOT standard concrete girder bridge and related items (approach, guardrails, piers, abutment, etc.). • Relocate existing force main (6”). • Storm sewer to be HDPE and RCB culverts. • Street lights. • Traffic signal (4) at intersection of Mumford and 2818. • Traffic control and project phasing to achieve project funding. • Erosion control and SWPP. https://brazosbid.ionwave.net/PublicDetail.aspx?bidID=3120&SourceType=1 cbenavides@bryantx.gov