Access the Full Project by Clicking here!
Bidjugde
JOB
Newell Road Bridge Replacement
BID DATE
05/13/25 - 12:00
AGENCY
Palo Alto
ESTIMATE
$12,000,000
SCOPE
Remove a 114-year-old bridge located over San Francisquito Creek spanning between Woodland Avenue (East Palo Alto) and Newell Road (Palo Alto). The existing bridge is approximate 22-ft wide and 80-ft long, and abutments are located within the creek. The proposed bridge is approximately 42.6-ft by 80-ft. Work includes design and install creek protection measure, dewatering plan, demo concrete structures, install new Caltrans standard concrete structures (bridge with reinforced pile abutments, floodwalls and retaining walls), raising the approaches (4-ft – 0) and utility appurtenances (hydrant, valves, cleanouts, laterals, mainlines, manholes, etc.) to grade. Contractor is responsible for the design of retaining walls, complying with environmental permits, preparing plans (traffic control, dewatering, logistics). Additional improvements include permanent creek protection measures, water line relocation, tree removal and new planting. https://procurement.opengov.com/portal/palo-alto-ca/projects/161126 nanette.obrien@cityofpaloalto.org
PREBID
4/28/2025 7:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT