Access the Full Project by Clicking here!
Bidjugde
JOB
Montecito Drive Transit Access Improvements (REBID)
BID DATE
02/5/26 - 12:00
AGENCY
Chino Hills
ESTIMATE
$370,000
SCOPE
The work comprises, but is not limited to: mobilization, traffic control, the removal and reconstruction of deteriorated pavement up to 7”; grind and overlay asphalt pavement up to 2”; striping; adjustment of utility manholes and covers; adjustment of utility valve cans, covers, and hydrant blowoffs; construction of PCC access ramps; storm drain improvements; street light conduits; driveway approaches; sidewalks; fence removal and replacement; retaining curbs and slough walls along Montecito Drive between Los Serranos Boulevard and Lugo Avenue. https://www.chinohills.org/bids.aspx?bidID=520&admin=1 engineering@chinohills.org
UPDATES